Chapter 23

Defects Management

# Chapter 23: Defects Management ![Understanding defects versus maintenance responsibilities](/images/guides/archreg/illustrations/23.1-DefectVsMaintenance.webp) Managing defects is where architectural theory meets building reality, and where your professional liability extends far beyond the last site visit. With Victoria's building regulator transforming into the Building and Plumbing Commission in July 2025 and gaining unprecedented powers to issue rectification orders up to 10 years after occupancy, you need to understand this framework inside out. ## **The Shifting Landscape** Let's start with what's changing right now. The Victorian Building Authority's documented failures have triggered the most significant regulatory overhaul since 1993\. From July 2025, the new Building and Plumbing Commission can issue rectification orders for a full decade after occupancy, and these apply retrospectively to work already completed. Think about that: projects you're working on today could face enforcement action in 2035\. The numbers tell a sobering story. Research from the Victorian Managed Insurance Authority shows that 92% of building insurance claims involve water-related defects. It's not just about leaking roofs anymore, we're seeing systemic failures from condensation in increasingly airtight buildings, thermal bridging through metal frames, and Melbourne's reactive clay soils causing havoc with foundations. Climate change is accelerating these patterns, with intense rainfall events and temperature extremes revealing building weaknesses that might have taken years to manifest in the past. Your role as an architect in this framework is both preventative and responsive. During design, you're establishing the DNA that determines whether a building will perform or fail. During construction, you're the guardian of design intent. And increasingly, you're being held accountable for both, with professional liability that extends well beyond practical completion. ## **Understanding the Legal Framework** Victorian defects management operates through overlapping statutory and contractual obligations that you need to navigate carefully. The Building Act 1993 establishes an absolute 10-year limitation period from the occupancy permit date. This is non-negotiable, there's no discovery rule, meaning claims are time-barred after 10 years regardless of when defects emerge. It's a hard stop that affects every project you touch. Within this statutory envelope sits your contractual framework. Most standard contracts (AS 4000, ABIC, HIA) specify a 12-month defects liability period where contractors have the right, and obligation, to return and fix problems. But here's where it gets interesting: AS 4000:2025, released mid-year after a 28-year wait, now allows practical completion to occur before the certificate is issued. This fundamentally changes when risk transfers from contractor to owner, and you need to understand these timing implications for every project. The Domestic Building Contracts Act adds another layer with implied warranties that can't be contracted out of. These warranties, that work will be carried out with reasonable care and skill, be fit for purpose, and comply with all laws, create obligations that persist throughout the full 10-year statutory period. Your certificates and observations during construction become critical evidence if these warranties are challenged. ## **Distinguishing Defects from Maintenance** This distinction might seem academic until you're standing in VCAT defending your assessment. Defects are breaches, of contract, standards, or statutory warranties, that create builder liability for rectification. Maintenance is the owner's responsibility for normal wear and tear. But the boundary between them shifts with time, documentation quality, and expert interpretation. The VCAT decision in Upton v Hartman Construction (2022) provides a masterclass in this distinction. When examining nail popping in plaster sheeting, the tribunal didn't just look at the physical symptoms, they analyzed the timeline from construction, applied the VBA Guide to Standards and Tolerances, and weighed expert evidence before awarding $235,000 in damages. Your documentation during construction becomes the evidence that determines these outcomes years later. Consider waterproofing, our most common defect category. A failed membrane is clearly a defect within the liability period. But what about staining that appears three years later? Is it defect manifestation or maintenance failure? Your initial specification, construction observations, and handover documentation often provide the answer. This is why thorough record-keeping isn't just good practice, it's professional survival. ## **Documentation Excellence** The new Building Manual requirements under Sections 41A and 41B of the Building Act represent a paradigm shift in documentation expectations. These aren't just as-built drawings anymore, they're comprehensive digital repositories that must accompany occupancy permit applications for prescribed building classes. Think of them as the building's DNA profile, containing everything from fire safety solutions to maintenance schedules. Your documentation obligations start at design and never really end. During construction, you're required to maintain records that include not just what was approved, but what wasn't. Every site inspection, every variation, every resolution of ambiguity needs to be captured. The Building Regulations specify exact requirements for Records of Inspection, and these become crucial evidence if defects emerge years later. Here's what catches many graduates: the documentation you create has multiple audiences and timeframes. The building surveyor needs it for compliance. The contractor needs it for construction. The owner needs it for maintenance. And potentially, a court might need it a decade later to determine liability. Each audience requires different information, but you're creating one integrated record that serves them all. ## **Practical Risk Management** Understanding patterns helps you prevent problems. In Victoria, water-related defects dominate because our climate creates perfect conditions for failure. Melbourne's Zone 6 temperate classification means high humidity meeting cold surfaces, reactive clay soils that move with moisture, and increasingly intense rainfall events that test every junction and penetration. When you're detailing, think about water pathways, not just the obvious ones, but condensation, rising damp, and wind-driven rain. The Cladding Safety Victoria program revealed something important: fixing one problem often reveals others. Among buildings in the rectification program, nearly 50% have non-cladding defects, with 80% showing water or moisture-related structural damage. This cascading defect phenomenon means your initial assessments need to look beyond the obvious. Professional indemnity insurance is your safety net, but it's not foolproof. Policies are claims-made, meaning you need continuous coverage throughout the potential liability period. The ARBV mandates minimum coverage of $1 million per claim, but given the new 10-year rectification orders, you might want to consider whether that's sufficient. Remember, your liability can extend beyond your direct client through proportionate liability provisions, potentially including subsequent purchasers and even neighbours affected by defects. **Key Terms:** - **Defects Liability Period**: The contractual period (typically 12 months) during which contractors must rectify defects at their cost, distinct from the statutory 10-year limitation period - **Rectification Order**: New enforcement tool allowing the BPC to compel defect repairs up to 10 years post-occupancy, with penalties up to $500,000 for non-compliance - **Latent Defect**: A defect not reasonably discoverable at practical completion that may emerge years later, Victoria provides no separate limitation period for these - **Building Manual**: Mandatory digital repository of all construction, compliance, and maintenance documentation required for occupancy permits from 2024 - **Practical Completion**: The point when works are reasonably capable of use despite minor defects, AS 4000:2025 allows this before certificate issuance - **Implied Warranties**: Non-excludable quality guarantees under the Domestic Building Contracts Act including fitness for purpose and compliance with laws - **Standards and Tolerances Guide**: VBA publication defining acceptable construction standards used by VCAT to distinguish defects from normal wear

Test Your Knowledge

Ready to test what you've learned in this chapter?

This guide is for educational purposes only. While we strive for accuracy, regulations and requirements may change. Please verify all information with official sources before making professional decisions.